How to get a license for construction and installation works
16.06.2021

To get a license for construction and installation works, a company needs an attested specialist on staff, a production base and machinery for the declared subtypes of works, and for categories II and I also experience and completed facilities. Since July 1, 2026, these rules have been set by the Construction Code and the new qualification requirements (Order No. 197 of 22.04.2026). Below are the requirements by category and the procedure.
The 30-second summary
- The license is issued by the local executive body of the capital, a region or a city of republican significance that exercises architectural and construction control, on an electronic application, within 15 working days.
- There are three categories: III — third-level facilities, II — second and third levels, I — all levels of responsibility.
- Category III requires no experience: a specialist, a base and machinery are enough. Category II requires five years as a licensee and five facilities as the general contractor (or ten as a subcontractor); category I requires ten years (seven for offshore oil and gas projects) or five years in category II, plus ten facilities as the general contractor (or twenty as a subcontractor).
- The Law “On Architectural, Urban Planning and Construction Activities” is no longer in force (except for certain provisions until July 1, 2028), and Order No. 136 of 09.12.2014 has been repealed.
This is general information, not legal advice on your particular case. On November 6, 2026 we checked the provisions against the Construction Code as amended on August 25, 2026, the Law “On Permits and Notifications” as amended on October 21, 2026 and Order No. 197; links are at the end of the article.
What changed on July 1, 2026
- The Construction Code No. 253-VIII of January 9, 2026 came into force on July 1, 2026, and the Law “On Architectural, Urban Planning and Construction Activities” of July 16, 2001 is no longer in force, except for certain provisions that remain in force until July 1, 2028 (subparagraph 2 of paragraph 2 of Article 148 of the Code). Licensing in construction is governed by Article 55 of the Code.
- The qualification requirements were approved by Order of the Acting Minister of Industry and Construction No. 197 of April 22, 2026 and apply from July 1, 2026. The previous Order of the Acting Minister of National Economy No. 136 of December 9, 2014 has been repealed (Annex 2 to Order No. 197).
- Construction specialists are moving from attestations to certificates: until July 1, 2028 they are equivalent (paragraph 8 of Article 147 of the Code), and from that date the requirements will mention only a certified worker (paragraph 5 of Order No. 197).
- A licensee’s specialist may not work part-time for other organizations engaged in the same activity (paragraph 3 of Article 55 of the Code).
Construction and installation license requirements by category
Section 3 of the qualification requirements: Chapter 4 — category III (rows 19–21), Chapter 5 — category II (rows 22–26), Chapter 6 — category I (rows 27–31). The licensor determines the category and states it in the special conditions of the license (paragraph 2 of Article 55 of the Code).
| Requirement | Category III | Category II | Category I |
|---|---|---|---|
| Facilities | Third level of responsibility; first and second levels under subcontracts | Second and third levels; first level under subcontracts | All levels of responsibility |
| Specialist on staff | At least one attested (certified) engineering and technical worker in the profile of the subtype, on a permanent basis: chief engineer, head of the production and technical department, site manager, works supervisor or foreman | ||
| Production base | Owned, held under economic or operational management and (or) leased for at least one year with registration in the legal cadastre | Only owned or held under economic or operational management | |
| Machinery and equipment | Owned or leased, under the list in Annex 3 to the requirements for each subtype | ||
| Experience | Not required | At least 5 years as a licensee or 5 years in category III | At least 10 years (7 for offshore oil and gas projects in Kazakhstan) or 5 years in category II |
| Completed facilities | Not required | At least 5 facilities of the second and (or) third levels as the general contractor or 10 facilities of the first and (or) second levels under subcontracts | At least 10 facilities of the first and (or) second levels as the general contractor or 20 under subcontracts |
Experience is counted from the date the construction and installation license was obtained; foreign persons may count an equivalent permit. If the license ceases to be valid, the experience is cancelled. Facilities are confirmed by copies of commissioning certificates (general contracting) or certificates of completed works (subcontracting). For more on category II, see “Category II license for construction and installation works“.
How to get a construction and installation license: the procedure
- Choose the subtypes. The license for construction and installation works is issued for subtypes: special works in soils, load-bearing and enclosing structures, linear structures, utility networks and systems, roads and railways, installation of process equipment and commissioning (item 6 of Annex 1 to the Law “On Permits and Notifications”).
- Check the requirements for each subtype. The profile of the specialist’s certificate and the list of machinery in Annex 3 depend on the subtype. If the same machine is needed for several subtypes, one unit is enough.
- Prepare the documents. The application, the document confirming payment of the license fee (unless paid through the “digital government” payment gateway) and the information forms on specialists, the base and equipment, and for categories II and I also a copy of the license to prove experience and information on completed facilities (paragraph 3 of Article 29 of the Law).
- File the application electronically through the state digital system of permits and notifications (paragraph 1 of Article 48 of the Law). The licensor is the local executive body that exercises state architectural and construction control and supervision (paragraph 5 of Article 55 of the Code).
- Receive the license or a reasoned refusal no later than fifteen working days (paragraph 1 of Article 30 of the Law). The license fee is paid on issue and reissue, the rate is set by the Tax Code; no fee is charged for an annex to the license (Article 31 of the Law).
What matters after you get the license
- The automated register checks compliance with the requirements continuously. An unremedied violation leads to suspension, failure to comply with the suspension leads to revocation, and two or more violations within a year lead directly to revocation (Article 51 of the Code).
- When the founders change, the license is reissued and the licensor checks compliance with the requirements again (paragraphs 6 and 7 of Article 55 of the Code).
- If the license ceases to be valid (paragraph 1 of Article 35 of the Law), the experience accumulated for categories II and I is lost and has to be built up again.
How KORGAN helps you get a construction and installation license
- Consultation. We look at the works you carry out and at which facilities, and choose the subtypes and category. The first consultation is free.
- Check. We check the specialists, base, machinery, experience and facility certificates against Order No. 197.
- Documents and filing. We prepare the application and information forms, file them electronically and follow the application until the license is issued.
The service in detail — on the page “Obtaining a license for construction and installation works“. Call us: +7 700 500 05 53 or write to us on WhatsApp.
We checked the provisions against the Construction Code (Articles 51, 55, 147, 148), the Law “On Permits and Notifications” (Articles 29–31, 35, 48, Annex 1) and the qualification requirements (Order No. 197, in Russian). For an overview of all licenses and permits, see “Obtaining licenses and permits in Kazakhstan“.
Frequently asked questions
Can a company get a category II construction license straight away?
Usually not. Category II requires at least five years of experience as a licensee and at least five facilities as the general contractor or ten as a subcontractor. Experience is counted from the date the license was obtained; foreign persons may count an equivalent permit.
How long does it take to get a construction and installation license?
No later than fifteen working days after the application; the deadline is the same for all categories (paragraph 1 of Article 30 of the Law “On Permits and Notifications”).
Are old specialist attestations still valid?
Yes, until July 1, 2028 attestations are equivalent to certificates (paragraph 8 of Article 147 of the Construction Code). From that date the qualification requirements refer only to a certified worker.
Does the base have to be owned?
For categories III and II a lease for at least one year with registration in the legal cadastre is enough. For category I the base must be owned or held under economic or operational management.